64th Avenue Electric Project

Commerce City, CO

September 2026 – Winter 2026

Overview

We’re upgrading about one mile of electric line in Commerce City, as part of our 64th Avenue Electric Project. We’ll work along 64th Avenue between Holly and Quebec streets and will upgrade about 4,700 feet of overhead line and replace 27 power poles. We will also replace some underground electric lines.

Upgrading aging electric infrastructure supports continued delivery of safe and reliable electric service and prepares the system to meet future customer needs. For customers, this means a reduced chance of outages, more resilient infrastructure, reduced wildfire risk, modernized equipment and adaptability for future growth.

This map is a graphic and may not show exact locations.

Construction updates

Construction will begin in September 2026 and continue through winter 2026.

Schedules are subject to change. 

How it affects you

During construction, you may notice:

  • Marking of utility lines and utility survey holes
  • Road and sidewalk closures with parking restrictions
  • Temporary changes to access
  • Construction noise
  • Work area restoration as weather allows

We are committed to maintaining a safe working environment in your community. For your safety and the safety of our crews, remember these tips:

  • Watch for construction crews and equipment
  • Do not enter construction areas
  • Obey signage and directions from crews
  • Follow posted trail detours and respect temporary closures near construction areas
  • Reduce speeds while traveling
  • Observe parking restrictions
  • Remain flexible as work progresses and work areas shift

Schedule

Construction is anticipated to begin in September 2026 and continue through winter 2026. Construction will occur Monday through Friday, with evening or weekend work as needed.
 
Schedules are subject to change. 
 

What you can do

If you have questions or comments, we want to hear from you.

Call us at 303-571-3737 or email [email protected] to learn more.

Safety

The safety of the public influences every decision we make. We take a proactive approach by implementing safety measures before, during and after construction, including clear signage, traffic management and routine inspections.

Our electric system, including distribution lines, is monitored by a 24/7/365 staffed control center. If there is an unanticipated event in the system, the flow of electricity into the system is shut off at a nearby substation to protect the public.

We inspect our infrastructure regularly to check for damage, equipment needing repair or replacement and anything else that might jeopardize safe, reliable operation of our equipment.

In the event of an electric infrastructure problem, clear the area immediately and contact Xcel Energy’s emergency number: 800-895-1999. Call 911 in an emergency.

For additional information on our commitment to safety, please visit our Public Safety page.

Document library

This field is for validation purposes and should be left unchanged.
Address
Please contact me about my comment(Required)
Scroll to Top